STP

STP FOR DNCC MAYOR’S HOUSE

INFORMATION

Project Name ……………. Mayor’s House (DNCC)
Category …………………Johkasou STP
Capacity …………………10m3/day
Location …………………Sector: 04, Uttara, Dhaka
Client …………………..Mayor MD. Atiqul Islam
Year …………………….2022

Features

At the House of the Honorable Mayor of DNCC, There is only 1  Module of BA 10 Which is a packaged sewage Treatment Technology called JOHKASOU. For the capacity of 10 m3/day.
It is installed Under the parking of the house and it takes a space of Length:3.60 m, Width: 2.20 m, Height: 1.98 m. 2 blowers are running for the aeration and no pump is needed in this project.

STP FOR DHAKA CANTONMENT

INFORMATION

Project Name ……………… Dhaka Cantonment
Category …………………..Johkasou STP
Capacity …………………..20 m3/day
Location …………………..Dhaka Cantonment
Client …………………….Dhaka Cantonment
Year ………………………2020

Features

At Lalpukur Par of Dhaka Cantonment, There is only 1 Module of BA 05 Which is a Packaged Sewage Treatment Technology called JOHKASOU. For the capacity of 05m3/day.
It is installed Over the Ground and it takes a space of Length:2.80 m, Width: 1.70 m, and Height: 1.98 m.2 blowers are running for the aeration and no pump is needed in this project.

STP FOR MOHAKHALI PUBLIC TOILET

INFORMATION

Project Name …………..Mohakhali Public Toilet
Category ……………………..Johkasou STP
Capacity ………………5 m3/day
Location……………….Mohakhali Rail Crossing
Client ………………..DNCC
Year ………………….2021

Features

This is a Packaged Type Sewage Treatment plant which is called Johkasou from DAIKI AXIS .There Is only one BA 5 module for the Public toilet. The outlet or treated water is reused in the flush, basins of the public toilet. For the there is a pump for recirculating the treated water in the toilets and a blower for aeration in the third chamber. it takes a space of Length:2.80 m, Width: 1.70 m, Height: 1.98 m.

Previous
Next

STP FOR SAIF MANSION (ABC HOUSE)

INFORMATION

Project Name………….Saif Mansion (ABC House)
Category………………………Johkasou STP
Capacity……………..5 m3/day
Location……………..Banani
Client……………….ABC Real Estate
Year…………………2021

Features

Johkasou technology is a JAPANESE Packaged type Sewage Treatment Technology. In This project The Johkasou module is from DAIKI AXIS , JAPAN. The Module is installed under the car parking of the house and its capacity is 5m3/day. There is a blower for the aeration process and The treated water goes directly into the Gulshan Lake. it takes a space of Length:2.80 m, Width: 1.70 m, Height: 1.98 m.

Previous
Next

STP FOR ACS FARMHOUSE

INFORMATION

Project Name …………ACS Farmhouse (ACS Textile)
Category…………………….Johkasou STP
Capacity……………..20 m3/day
Location……………..Dumni,Khilkhet
Client……………….ACS Textile
Year…………………2021

Features

This Johkasou STP plant is use for the sewage as well as the cow dung and other animal’s dung. There is agitation in the raw water tank and also screening bar so that the waste from the pit can be separated by solid and liquid.
The modules (2 nos BA 10) are installed parallelly which is capable of treating approximately 20 m3/day. The treated water is used for gardening. And through a over flow line in the treated water tank , the excess water goes into the drain.

Previous
Next

STP FOR SPLASH WORKS OFFICE

INFORMATION

Project Name …………….. Splash Works Office
Category …………………..Johkasou STP
Capacity …………………..50 m3/day
Location …………………..Gajaria, Munshiganj
Client ……………………..Splash Works
Year ………………………..2021

Features

There is a BA 50 Johkasou module of DAIKI AXIS for the capacity of 50m3/day. A raw water tank with screening and agitation is present at there.2 Submersible pump operates alternatively for pumping raw water from raw water tank to the module. The module and the raw water and also the treated water tanks are installed under the ground.

Previous
Next

STP FOR SPLASH WORKS WATER PARK (CENTRAL)

INFORMATION

Project Name …………….. Splash Works Water Park
Category …………………….. Johkasou STP
Capacity ……………………… 200 m3/day
Location …………………….. Gajaria, Munshiganj
Client …………………………. Splash Works
Year ……………………………. 2021

Features

This project is run by Johkasou Module from DAIKI AXIS Japan. There are 4 modules of 50 m3/day( 4x BA 50).They are connected to each other. This is installed under the ground. The 4 units are connected with series connections.

STP FOR SPLASH WORKS DORMITORY

INFORMATION

Project Name …………….. Splash Works Dormitory
Category ……………………Johkasou STP
Capacity ……………………… 50 m3/day
Location …………………….. Gajaria, Munshiganj
Client …………………………. Splash Works
Year ……………………………. 2021

Features

There is one 50m3/day Johkasou STP module (BA 50).This STP is for near about 235 persons. A raw water Tank with screening and agitation is present and the treated water flows out after reserving in the treated water tank

Previous
Next

STP FOR SHEIKH HASINA MEDICAL COLLEGE AND HOSPITAL

INFORMATION

Project Name ……………Sheikh Hasina Medical College Hospital
Category ……………….Johkasou STP
Capacity ……………….250 m3/day
Location ……………….Tangail Sadar, Tangail
Client …………………PWD
Year …………………..2021

Features

There are 5 BA 50 (Capacity 50 m3/day) are connected by divider box. As a result the flow is divided equally into each module. The treated water then goes for the tertiary treatment through sand filter. The final output is used in the fountain there

Previous
Next

STP FOR MADARIPUR 10 STORIED GOVERNMENT BUILDING

INFORMATION

Project Name …….Madaripur 10 Storied Building Combined GVT. Office
Category ……………Johkasou STP
Capacity ……………30 m3/day
Location ……………Madaripur Sadar, Madaripur
Client ……………….PWD
Year …………………2021

Features

DAIKI AXIS Johkasou model BA 30 is installed in this project. Its capacity is 30 KLD. The treated water is being tertiary treated by sand filter and then used for fountain water.

Previous
Next

STP FOR COX BAZAR DEVELOPMENT AUTHORITY

INFORMATION

Project Name ………..Cox’s Bazar Development Authority
Category ……………Johkasou STP
Capacity ……………80 m3/day
Location ……………Cox’s Bazar
Client ………………Cox’s Bazar Development Authority
Year ………………..2021

Features

2 BA 40 (capacity 40m3/day) are used for this project. There is a raw water tank in which agitation occurs. By a submersible pump ( 15 m head) the sewage water goes into the module. The modules are connected in series connection. And after the module there is a sand filter which is for the tertiary treatment and the finally treated water is used as the fountain water

Previous
Next

STP FOR HOTEL BEACH CLUB

INFORMATION

Project Name …………….. Hotel Beach club
Category …………………Johkasou STP
Capacity ………………..5m3/day
Location ……………….Cox’s Bazar
Client ………………..Best Western
Year …………………2020

Features

At hotel Beach Club , Coxs Bazar , the Module is BA 5 (Capacity: 5 m3/day). It is installed above the ground . It’s dimension: Length:2.80 m, Width: 1.70 m, Height: 1.98 m.

Previous
Next

STP FOR HOTEL SAYEMAN HERITAGE

INFORMATION

Project Name …………….. Hotel Sayeman Heritage
Category ………………….Johkasou STP
Capacity ………………….80 m3/day
Location ………………….Cox’s Bazar
Client ……………………Gasmin Limited
Year ……………………..2021

Features

There is  DAIKI AXIS Johkasou BA 80 module. There are two tanks for BA 80 ( 80m3/day). A raw water tank is present with screening and agitation. The modules are made of FRP(Fiber reinforced plastic). There is a treated water tank at the end. 6 blowers and for controlling the pumps and blower there is control unit.

Previous
Next

STP FOR SHEIKH HASINA LEBUKHALI CANTONMENT

INFORMATION

Project Name ……..Sheikh Hasina Cantonment (Group-6)
Category …………Johkasou STP
Capacity …………100 m3/day
Location …………Lebukhali, Barishal
Client …………..MES
Year……………..2022

Features

There are  BA 100 (Capacity :100 m3/day) in this project. The modules are made of FRP. There are 9 blowers and a pump for pumping the raw water from raw water tank. There is send vessel for clearing the treated water. The final treated water their used in gardening.

Previous
Next

STP FOR SHEIKH HASINA LEBUKHALI CANTONMENT

INFORMATION

Project Name …………….. Sheikh Hasina Cantonment (Group-3)
Category ……………………. Johkasou STP
Capacity ………………………200m3/day
Location …………………….. Lebukhali, Barishal
Client ………………………… MES
Work Status ………………… On Going

Features

There is a STP (Capacity of 200 m3/day) in this project. The modules are made of FRP. There are 16 blowers and a pump for pumping the raw water from raw water tank. There is send vessel for clearing the treated water. The final treated water their used in gardening.

STP FOR SHEIKH HASINA LEBUKHALI CANTONMENT

INFORMATION

Project Name …………….. Sheikh Hasina Cantonment (Group-3)
Category ……………………. Johkasou STP
Capacity ………………………200m3/day
Location …………………….. Lebukhali, Barishal
Client ………………………… MES
Work Status ………………… On Going

Features

There is a STP (Capacity of 200 m3/day) in this project. The modules are made of FRP. There are 16 blowers and a pump for pumping the raw water from raw water tank. There is send vessel for clearing the treated water. The final treated water their used in gardening.

STP FOR SHEIKH HASINA LEBUKHALI CANTONMENT

INFORMATION

Project Name …………….. Sheikh Hasina Cantonment (Group-5)
Category ……………………….Johkasou STP
Capacity ……………………..140 m3/day
Location …………………….. Lebukhali, Barishal
Client ………………………… MES
Work Status …………………On Going

Features

There is a STP (Capacity of 140 m3/day) in this project. The modules are made of FRP. There are 12 blowers and a pump for pumping the raw water from raw water tank. There is send vessel for clearing the treated water. The final treated water their used in gardening.

STP FOR SHEIKH HASINA LEBUKHALI CANTONMENT

INFORMATION

Project Name …………….. Sheikh Hasina Cantonment (Group-7)
Category ……………………. Johkasou STP
Capacity …………………….. 100 m3/day
Location …………………….. Lebukhali, Barishal
Client ………………………… MES
Work Status …………………On Going

Features

There is a STP  (Capacity of 100 m3/day) in this project. The modules are made of FRP. There are 9 blowers and a pump for pumping the raw water from raw water tank. There is send vessel for clearing the treated water. The final treated water their used in gardening.

STP FOR SHEIKH HASINA LEBUKHALI CANTONMENT

INFORMATION

Project Name …………….. Sheikh Hasina Cantonment (Group-7)
Category ……………………. Johkasou STP
Capacity …………………….. 100 m3/day
Location …………………….. Lebukhali, Barishal
Client ………………………… MES
Work Status …………………On Going

Features

There is a STP of  (Capacity of 100 m3/day) in this project. The modules are made of FRP. There are 9 blowers and a pump for pumping the raw water from raw water tank. There is send vessel for clearing the treated water. The final treated water their used in gardening.