Project Name: Al-Islam Textile Ltd. Rooftop Solar PV System
Project Type: Rooftop On-Grid Solar PV System
Client: Al-Islam Textile Ltd.
Location: Karnapara, Savar, Dhaka, Bangladesh
System Capacity (DC): 350 kWp
System Capacity (AC): 300 kW
Industry: Textile & Garments
Application: Industrial Power Generation
Al-Islam Textile Ltd. sought to improve energy efficiency and reduce electricity costs by installing a rooftop solar PV system. The objective was to harness renewable solar energy to support daily manufacturing operations while contributing to the company's sustainability goals.
Solar System Type: Rooftop On-Grid PV
DC Capacity: 350 kWp
AC Capacity: 300 kW
Installation Location: Factory Rooftop
Project Location: Karnapara, Savar, Dhaka, Bangladesh
A 350 kWp DC rooftop solar photovoltaic system with a 300 kW AC grid-connected configuration was installed to generate clean electricity for the factory. The system is designed to provide reliable daytime power, helping offset a significant portion of the facility's electricity demand while ensuring efficient and sustainable energy production.
The rooftop solar system helps lower energy expenses by generating renewable electricity during peak production hours.
By integrating solar energy into its operations, Al-Islam Textile Ltd. reduces its environmental footprint and supports cleaner manufacturing practices.
The project transforms unused rooftop space into a productive renewable energy asset without disrupting factory operations.
The solar PV system provides dependable power generation with low maintenance requirements, delivering long-term operational and financial benefits.
The textile industry is one of Bangladesh's largest energy consumers. Projects like the Al-Islam Textile Ltd. Rooftop Solar PV System demonstrate how renewable energy can help manufacturers reduce operating costs, improve energy efficiency, and advance their sustainability objectives while supporting the country's transition toward clean energy.
The Al-Islam Textile Ltd. Rooftop Solar PV System reflects the growing adoption of renewable energy in Bangladesh's textile sector. With a capacity of 350 kWp DC (300 kW AC), the project delivers reliable, clean electricity that enhances operational efficiency, reduces energy costs, and reinforces the company's commitment to sustainable industrial development.